At what stage of house construction are windows installed and when should they be ordered?

At what stage of house construction are windows installed and when should they be ordered?

The timing of ordering windows is one of the most important decisions when building a house. Acting too late can delay subsequent stages of the project.

The window order must be aligned with the construction schedule to avoid disrupting its smooth operation. So when?

When is the best time to place an order for windows?

It’s worth remembering that windows should be ordered well in advance, not just before the planned installation date. The best time to place an order is during the roof construction phase or immediately after, as this is when the window openings are finally prepared and accurate measurements can be taken.

Order processing time

The waiting time for windows depends on several factors: profile type, color, glazing units, hardware, and glazing size. Typically, the lead time is 3 to 6 weeks, but for more unusual projects, it can extend to 8-10 weeks. During the construction season, particularly in spring and summer, the wait is even longer due to the higher volume of orders.

If you plan to order AdamS windows, please contact us or send us a request for a free quote to check delivery times:

Closed shell stage – time for window installation

Windows are typically installed after the shell stage is complete, meaning when the building has already had its load-bearing and partition walls constructed, and the ceiling, chimney, and roof structure with roofing completed. At this stage, the building is ready to transition to the shell stage.

The first stage of the shell phase is the installation of windows and doors. This protects the interior of the house from rain, wind, and temperature fluctuations, allowing for further finishing work.

Therefore, when planning a house construction schedule, it’s important to plan your window order well in advance. This will ensure the transition to the next stages of construction runs smoothly, without unnecessary delays.

Check out Passiv-Line windows from AdamS

The Passiv-Line window line is dedicated to energy-saving and passive projects.

Free qute - AdamS windows

Submit an inquiry to receive a free quote for AdamS windows and doors.

Latest posts

Envoyer une demande

HANDLE-CONTROLLED OPENING BRAKE

  • individual adjustment of opening width: casement is blocked at any desired orientation
  • keeps the casement in the open position even in strong wind
  • easy to retrofit

ROTATING MUSHROOM SWIVEL

  • locking element in the form of a rotating mushroom, which enables smooth and trouble-free opening, tilting, and closing of windows
  • adapts automatically to changing conditions, for example to the ambient temperature
  • enables-smooth adjustment of pressure

ANTI-BURGLARY CATCH

  • a new generation of latches provides high security and low friction levels

CASEMENT LIFT

  • prevents sagging of casements, ensures smooth closing, prevents mishandling

BALCONY SNAPPER CATCH

  • together with a handle, it allows shuƫng the window from the outside, protects against loosing heat from a room, deactivated in the tilt position

STANDARD HINGE

SPS MICRO-VENTILATION

  • constant supply of the necessary volume of fresh air without drafts
  • minimized risk of fungus and a healthy climate in the room

WINTER-SUMMER AIR LATCH

  • reduces heat loss and saves energy
  • in the summer, a window is tilted as usual; in the winter the tilt is limited to approx. 40 mm
  • integrated protection against closing shut

GRADUAL TILT

  • enables adjusting the intensity of ventilation; windows can be set in 5 different positions (tilt range from 4 to 33 mm)

HIDDEN HINGE

  • gives windows a subtle look
  • excellent durability and low wear of elements
  • continuous sealing guarantees excellent thermal and acoustic insulation
  • numerous adjustment possibilities allow maintaining smooth operation of casements for a long time